3 in
Residential driveway
Passenger cars on a well-drained, properly compacted aggregate base.
Free · instant · no sign-up
Turn real dimensions into a defensible material budget in under a minute—before a truck or contractor arrives.
Instant material estimate
Climate-smart planning
Hot & Humid (Southeast/Gulf Coast)
High temperatures, heavy rainfall, and long wet seasons put both binder and base drainage under stress.
Common issues in Florida
State-level guidance only. Confirm the binder grade and pavement section with the local specification or supplier.
Read the number correctly
The calculator estimates compacted asphalt material. It intentionally leaves out excavation, base, delivery, labor, equipment, and permits so you can see what the mix itself contributes to a quote.
Asphalt calculator formula
An asphalt calculator converts paved area into compacted volume, then weight. Start with length × width. Multiply by compacted thickness in feet, then density, and divide pounds by 2,000:
A 20 × 20-foot driveway at 3 inches has 100 cubic feet of volume. At 145 lb/ft³: 7.25 tons before allowances and about 7.8 tons after 5% waste plus 3% field compaction.
Density is the assumption people most often miss. Hot mix is commonly estimated near 145 lb/ft³, but an approved job mix may differ. Use a supplier’s density when available. Measure irregular paving as separate rectangles and add quantities. Curves, widening, and handwork can justify more waste.
Asphalt coverage calculator
Thickness changes coverage in direct proportion. One ton covers twice as much area at 2 inches as it does at 4 inches. These values use compacted hot mix at 145 lb/ft³ and exclude waste.
| Compacted thickness | Typical planning use | Coverage per ton | Tons for 400 ft² |
|---|---|---|---|
| 2" | Overlay / light duty | 82.8 ft² | 4.83 |
| 3" | Residential driveway | 55.2 ft² | 7.25 |
| 4" | Parking / heavier use | 41.4 ft² | 9.67 |
| 6" | Heavy-duty section | 27.6 ft² | 14.5 |
Planning values are rounded. “Thickness” means the finished compacted lift—not loose depth before rolling.
Asphalt driveway cost calculator
Installed prices are often discussed per square foot, but that figure hides the project structure. For early planning, a straightforward replacement or new driveway may fall around $5–$12 per square foot. Small jobs, difficult access, excavation, drainage, base repair, curbs, or premium finishes can cost more.
Separate material, trucking, preparation, placement, and extras. A 400 ft² driveway at 3 inches needs about 7.8 tons. At $90–$160 per ton, hot-mix material is roughly $700–$1,250. Installation also includes mobilization, removal, grading, aggregate, and crew time.
Soft soil, poor drainage, and failed aggregate must be corrected first.
Small projects still need trucking, a paver or hand crew, rollers, and setup.
Gates, slopes, curves, utility covers, and handwork reduce production.
Plant distance, minimum loads, fuel, and local demand affect delivered price.
Design before you order
Thickness is not a substitute for a stable base. These compacted depths are estimating starts; soil, traffic, climate, and local specifications should determine the final pavement section.
3 in
Passenger cars on a well-drained, properly compacted aggregate base.
4 in
Light commercial traffic with stronger lanes or separate truck areas.
5–6 in
Frequent delivery trucks and heavier repetitions; engineering advised.
2 in
A surface course over pavement that is structurally sound and properly repaired.
Asphalt is placed in compacted lifts. A 6-inch design may be built in two courses rather than one thick pass. Ask whether a quote states loose or compacted depth, whether thickness is average or minimum, and whether heavy-use areas receive a different section.
2026 regional prices
The state selector uses a material-only range for early budgets. Asphalt must arrive hot enough to compact, so plant distance matters. Nearby producers, full truckloads, common mixes, and flexible schedules generally cost less than small specialty orders with long hauls.
These figures are editorial planning estimates updated for 2026, not live supplier quotes or government bid indices. Use them to spot a major mismatch, then call local plants or paving contractors for current delivered pricing.
$100–$150 per ton · material
Open local guide → TX calculator$85–$135 per ton · material
Open local guide → CA calculator$120–$190 per ton · material
Open local guide → NY calculator$115–$185 per ton · material
Open local guide → PA calculator$105–$170 per ton · material
Open local guide →| State | 2026 material range | Climate planning tag |
|---|---|---|
| Alabama | $90–$140/ton | hot humid |
| Alaska | $145–$225/ton | cold |
| Arizona | $95–$150/ton | hot dry |
| Arkansas | $85–$135/ton | mixed humid |
| California | $120–$190/ton | varied |
| Colorado | $100–$160/ton | cold dry |
| Connecticut | $120–$185/ton | freeze thaw |
| Delaware | $105–$165/ton | mixed humid |
| District of Columbia | $125–$195/ton | mixed humid |
| Florida | $100–$150/ton | hot humid |
| Georgia | $90–$145/ton | hot humid |
| Hawaii | $150–$240/ton | tropical |
| Idaho | $95–$155/ton | cold dry |
| Illinois | $95–$155/ton | freeze thaw |
| Indiana | $90–$145/ton | freeze thaw |
| Iowa | $90–$145/ton | freeze thaw |
| Kansas | $85–$140/ton | mixed dry |
| Kentucky | $90–$145/ton | mixed humid |
| Louisiana | $90–$145/ton | hot humid |
| Maine | $120–$185/ton | cold |
| Maryland | $105–$165/ton | mixed humid |
| Massachusetts | $125–$195/ton | freeze thaw |
| Michigan | $95–$155/ton | freeze thaw |
| Minnesota | $95–$155/ton | cold |
| Mississippi | $85–$140/ton | hot humid |
| Missouri | $85–$140/ton | mixed humid |
| Montana | $105–$170/ton | cold dry |
| Nebraska | $90–$145/ton | mixed dry |
| Nevada | $100–$160/ton | hot dry |
| New Hampshire | $120–$185/ton | cold |
| New Jersey | $115–$180/ton | freeze thaw |
| New Mexico | $95–$150/ton | hot dry |
| New York | $115–$185/ton | freeze thaw |
| North Carolina | $90–$145/ton | mixed humid |
| North Dakota | $100–$165/ton | cold |
| Ohio | $90–$150/ton | freeze thaw |
| Oklahoma | $85–$135/ton | mixed dry |
| Oregon | $105–$170/ton | cool wet |
| Pennsylvania | $105–$170/ton | freeze thaw |
| Rhode Island | $125–$195/ton | freeze thaw |
| South Carolina | $90–$145/ton | hot humid |
| South Dakota | $95–$155/ton | cold dry |
| Tennessee | $85–$140/ton | mixed humid |
| Texas | $85–$135/ton | hot varied |
| Utah | $100–$160/ton | cold dry |
| Vermont | $120–$185/ton | cold |
| Virginia | $95–$155/ton | mixed humid |
| Washington | $105–$170/ton | cool wet |
| West Virginia | $100–$160/ton | mixed humid |
| Wisconsin | $95–$155/ton | cold |
| Wyoming | $105–$170/ton | cold dry |
Hot mix asphalt calculator
Asphalt is not one universal material. Select the intended mix so the calculator uses a suitable planning density, then confirm local production availability and the job specification.
Default · 145 lb/ft³
The familiar dense-graded choice for driveways, streets, and parking lots. It is produced and placed hot so hauling and weather windows matter. Hot mix has wide availability and established local designs.
Lower temperature · 143 lb/ft³
Additives or foaming allow production and placement at lower temperatures. Benefits may include lower fuel use, reduced fumes, and a longer compaction window. Performance depends on the mix design, not the label alone.
Open graded · 135 lb/ft³
Connected voids let water drain through the surface into a specially designed stone reservoir. It is a stormwater system, not simply a different top layer, and needs careful subgrade, overflow, and maintenance design.
Quote verification
Use the asphalt calculator to compare quantity first. If a contractor’s tonnage is higher, ask whether the quote includes thicker sections, leveling, irregular geometry, or a larger field allowance. A thoughtful answer is more valuable than forcing every bid to match the calculator.
Next compare scope line by line. The lowest number may omit excavation, aggregate base, tack coat, drainage, edge support, utility adjustments, striping, or cleanup. Confirm compacted thickness, paved area, mix designation, warranty, payment schedule, and who handles permits. Check licensing and insurance through the appropriate state or local source.
Straight answers
The calculator is precise about its math and deliberately cautious about field conditions.
A 20-by-20-foot driveway is 400 square feet. At 3 inches compacted and 145 lb/ft³, it needs about 7.25 tons before allowances. With 5% waste and a 3% compaction allowance, the planning quantity is about 7.8 tons.
At 3 inches compacted and 145 lb/ft³, one square foot uses about 0.0181 ton, so one ton covers roughly 55 square feet. At 2 inches it covers about 83 square feet; at 4 inches, about 41 square feet.
As of 2026, a straightforward installed driveway often budgets around $5–$12 per square foot, while asphalt material alone commonly falls near $90–$160 per ton nationally. Demolition, base, drainage, access, labor, delivery, and local demand can move the installed quote.
Two compacted inches may be suitable as an overlay on structurally sound pavement, but it is usually thin for a new driveway. Three compacted inches over a properly prepared base is a more useful residential starting point.
Hot mix is produced and placed at conventional high temperatures. Warm mix uses additives or foaming to reduce production temperature, which can lower fuel use and extend the compaction window. Final performance still depends on the approved mix design and construction.
A well-built asphalt driveway often lasts 15–25 years. Drainage, base support, traffic, climate, construction quality, crack sealing, and timely repairs matter more than a single age estimate.
As of 2026, use about $100–$150 per ton as a Florida material-only planning range. Current plant pricing, delivery distance, order size, mix specification, taxes, and small-load fees can produce a different quote.
As of 2026, use about $85–$135 per ton as a Texas material-only planning range. The Gulf Coast, major metros, West Texas hauling distances, and the selected mix can shift current delivered prices.
Sometimes, but the base must be dry and unfrozen and the mat must retain enough heat for compaction. Thin lifts and long hauls cool quickly. Follow the mix specification and contractor or agency minimum placement temperatures.
Four compacted inches is a common light-duty planning start. Truck lanes, loading areas, weak subgrades, and high traffic may require 5–8 inches in multiple lifts over an engineered aggregate base.